Location: Queens, NY
Client: NYCDEP
Consultant: Greeley & Hansen
As a part of improving water quality within the New York Harbor and its estuaries, replacement of the discharge piping, valves and controls will be completed.
YAS performed structural modifications to the Low Level and High Level Pump Station including concrete pedestals for piping and valves, installation of new resistor bank controllers, wound rotor motors, replacement of sump pumps and piping, constructing an overflow chamber from the High Level to the Low Level Wet well and installation of Raw Sewage Conduit and connection to the Flow Division Structure (FDS).